The installation and debugging of pneumatic three-way ball valves are key steps to ensure their normal operation and performance. Below, we will provide a detailed introduction to this process.

 

1、 Installation

 

1.1 Confirm Installation Environment

 

Before installing a pneumatic three-way ball valve, it is first necessary to confirm whether the installation environment meets the requirements. Installation should be carried out in a dry, dust-free, non violent vibration, and non corrosive medium environment. At the same time, ensure that the valve installation position is easy to operate and maintain.

 

1.2 Cleaning the pipeline

 

During the installation process, it is necessary to ensure the cleanliness of the valve inlet and outlet pipelines to prevent impurities from entering the interior of the valve.

 

1.3 Connection method

 

The connection methods for pneumatic three-way ball valves usually include flange connection, threaded connection, and welding. Choose the appropriate connection method based on the actual working conditions and ensure that the connection is firm and reliable.

 

1.4 Installation direction

 

The installation direction of the pneumatic three-way ball valve should be in accordance with the manufacturer's instructions. In general, the direction of the valve stem should be consistent with the direction of the pipeline for easy operation and maintenance.

 

2、 Debugging

 

After completing the installation of the pneumatic three-way ball valve, it is necessary to debug the valve to ensure its normal operation.

 

2.1 Opening and closing tests

 

During the debugging process, start with opening and closing tests. During the opening and closing process, the valve should be observed for stability and no jamming. At the same time, the fit between the valve core and sealing surface should be checked to ensure good sealing performance.

 

2.2 Pneumatic performance testing

 

After conducting opening and closing tests, it is also necessary to test the pneumatic performance of the pneumatic three-way ball valve. By connecting the air source, check whether the action of the pneumatic actuator is accurate and sensitive, and compare it with the control signal to ensure that the valve response meets the requirements.


Copyright ©2023 Zhejiang Yingke Nieer Valve Co., Ltd   All Rights Reserved.        浙ICP备2023025189号-1

Tel: 0577-57889166 57889168       Mobile: +86-15167703599 (WeChat)
Address: Puyi Industrial Zone, Oubei Town, Yongjia County, Zhejiang Province    http://www.zjinconel.com


 Scan WeChat